Gali Anjaneya Swamy Temple Ward Ward (Wardno:157) Project Details Total Projects : 118
|
| SL No. |
Workcode |
View / Comments |
Project Name |
| 1 |
095-10-N-G-E-R-KP-001 |
 |
painting to road side Kerbs in arterial and Sub arterial roads in ward No.95 |
| 2 |
095-10-N-G-E-B-FO-001 |
 |
Construction of Nirmala Toilet in ward No.95 |
| 3 |
094-10-N-P-E-B-FO-001 |
 |
Construction of Nirmala Bangalore Toilet infront of Bhapujinagara Bus stand in ward no -41 |
| 4 |
094-10-N-G-E-B-FO-001 |
 |
Regarding of Drains Couning slab & Improvements of footpath in Mysore Road in ward No.95(41) |
| 5 |
041-09-N-S-F-R-FO-001 |
 |
a) Construction of delapidated drain in service road from BDA Layout b) Providing Footpath in service road from BDA Layout to Ring road |
| 6 |
041-09-N-G-H-P-PV-001 |
 |
Providing & fixing of ormnamental grill fencing & cobble stone pathway to the vacant land in the Sy No.27/1 |
| 7 |
041-09-M-G-E-R-WB-001 |
 |
Rewriting of street Name /ornamental Name boards in ward Jurisdiction ward No.41 |
| 8 |
041-09-M-G-E-R-MN-001 |
 |
Filling of pot holes in Jurisdiction ward No.41 |
| 9 |
041-09-M-G-E-R-DC-001 |
 |
Depot collection for the year 2008-09 in ward No.41 |
| 10 |
041-09-M-G-E-R-AS-002 |
 |
Asph to 3rd 4th 6th to 10th Cross in B.pura New Extension and 1st 5th cross in Raghavanagar 1st to 4th Cross in Vinobha Colony in cross road ganapathi nagar |
| 11 |
041-09-M-G-E-D-DE-001 |
 |
Desilting of tertiary drains in bytarayanapura v. colony & N T Y Layout |
| 12 |
041-08-N-W-T-B-EF-001 |
 |
Providing Electrification to SC/ST Houses Under Bhagyajyothi Scheme in Gali Anjaneya Swamy Temple in Ward No. 41 |
| 13 |
041-08-N-G-E-B-EG-001 |
 |
Providing 250 W. S.V. Fittings at Various Places in Gali Anjaneya Swamy Temple In Ward No. 41 |
| 14 |
041-07-I-G-T-S-IM-002 |
 |
Replacing the SV Lamps and Chokes by Metal Halide Lamps and Chokes to 20 Mtrs High Mast Lighting System at Byatarayanapura Police Station in Ward No. 41 |
| 15 |
041-07-I-G-T-S-IM-001 |
 |
Replacing the SV Bulbs and Chokes by Metal Halide Lamps and Chokes to 30Mtrs. High Mast Lighting system at Mysore Road and Vijaya Nagara Chord road Junction in Ward 41 |
| 16 |
|
 |
Providing Cement and Concrete |
| 17 |
|
 |
Construction of pedestrian under pass/ segmental under pass in ward No.41. |
| 18 |
|
 |
Maintenance of Toilets in ward No.41 |
| 19 |
000-10-N-P-P-O-MI-118 |
 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR REDEV OF YEDIYUR MKT |
| 20 |
105-11-N-G-O-P-PL-001 |
 |
RAISING AND MAINTENANCE OF MONSOON PLANTATION IN AUSTIN TOWN RAISED IN WARD 105 |
| 21 |
134-11-N-G-O-P-PL-001 |
 |
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 134 |
| 22 |
157-11-000001 |
 |
Improvements and Repairs to Tailoring Building and Corridor to School Building at Bytarayanapura |
| 23 |
157-11-000002 |
 |
Special repairs to BBMP Buildings |
| 24 |
157-11-000003 |
 |
Restoration of Roads cut Portions in Kasturaba Nagar and Bytarayanapura Limits |
| 25 |
157-11-000004 |
 |
Restoration of Roads Cut Portions in Muneshwara Blocks Limits |
| 26 |
157-11-000005 |
 |
Providing Pothole filling and Depo collection for the Year 2010-11 |
| 27 |
157-11-000006 |
 |
Repairs to Byatarayanapura Main Road and cross roads Footpath |
| 28 |
157-11-000007 |
 |
Engaging Labours and Tractors for Desilting of Drains in Ward Jurisdiction |
| 29 |
157-11-000008 |
 |
Construction of Prayer Hall at Narasimhaih Badavane, Byatarayanapura |
| 30 |
157-11-000009 |
 |
Resurfacing to Bad reach roads in Bytarayanapura, Ganapathinagara and Iyanna Shetty Layout |
| 31 |
157-11-000010 |
 |
Resurfacing to Bad reach roads in Kasturba Nagara, Avalahalli, Raghavanagara and Muneshwara Block |
| 32 |
157-11-000011 |
 |
Providing C.C. to Avalahalli Cross Roads in Avalahalli |
| 33 |
157-11-000012 |
 |
Construction of C.C. Drain and covering of Slabs (near Giri Maruthi School) in Byatarayanapura |
| 34 |
157-11-000013 |
 |
Regrading of Drains and improvements to Drains in Iyanna shetty Layout |
| 35 |
157-11-000014 |
 |
Regrading of Drains and improvements to Drains in Ganapathi Nagara |
| 36 |
157-11-000015 |
 |
Improvements and reconstruction of Drains in M.M. Road |
| 37 |
157-11-000016 |
 |
Improvements and reconstruction of Drains in main road of Bytarayanapura |
| 38 |
157-11-000017 |
 |
Improvements to Drains in Bytarayanapura New Extension |
| 39 |
157-11-000018 |
 |
Regrading of Drains and Improvements to Drains in Kasturabha Nagar |
| 40 |
157-11-000019 |
 |
Improvements to Drains and culverts in Avalahalli Main road and Gajendra Nagar |
| 41 |
157-11-000020 |
 |
Improvements to Drains and culverts in Sharadha School Road area |
| 42 |
157-11-000021 |
 |
Improvements to Drains `A` Cross Roads Behind Plagamma Temple |
| 43 |
157-11-000022 |
 |
Improvements to Drains in Raghava Nagar |
| 44 |
157-11-000023 |
 |
Reconstruction of Drains in bytarayanapura corss Roads |
| 45 |
157-11-000024 |
 |
Redevelopment of Yediyur Market, Kanakapura Road, Bangalore |
| 46 |
157-11-000025 |
 |
Providing Electrical Fixture to BBMP Help Point in Gali Anjaneya Swamy Ward |
| 47 |
157-11-000026 |
 |
Providing 250 Watts SV Fittings/Poles/Control Wires/Park Lightings/Switches Etc,. in Ward No.157 |
| 48 |
157-11-000027 |
 |
Resurfacing to bad reaches of interior roads at Byataranapura limits in ward no 157 |
| 49 |
157-11-000028 |
 |
Resurfacing to bad reaches of interior roads at Raghava nagar,Kasturba nagar in ward no157 |
| 50 |
157-11-000029 |
 |
Providing Water supply through tanker in ward no. 157 |
| 51 |
157-11-000030 |
 |
Construction of library hall in P K Qts at kasturabha nagara in ward 157 |
| 52 |
157-11-000031 |
 |
Improvements to drains in 5th 6th 6th A and 7th cross at Ganapathi nagara in ward 157 |
| 53 |
157-11-000032 |
 |
Improvements to drains and footpath slab in B cross in Byatarayanapura in ward no 157 |
| 54 |
157-11-000033 |
 |
Providing RCC covering slab over existing open drain in Iyanna shetty layout |
| 55 |
157-11-000034 |
 |
Improvements to drains in Vasudeva Battacharya A cross road in ward 157 |
| 56 |
157-11-000035 |
 |
Improvements to drains in Ganapathi temple road in Kasturabha nagara in ward 157 |
| 57 |
157-11-000036 |
 |
Providing cement concrete to roads in Byatarayanapura Hosa badavane in ward no 157 |
| 58 |
157-11-000037 |
 |
Formation of Rcc covering slab and CC road over SWD behind govt school in ward 157 |
| 59 |
157-11-000038 |
 |
Improvements to drains in NAK cholultry opposite main road and covering slabs in post office road in ward 157 |
| 60 |
157-11-000039 |
 |
Improvements to drains and covering slab in Avalahalli main roadin ward no 157 |
| 61 |
157-11-000041 |
 |
Providing center line painting to all main roads in ward 157 |
| 62 |
157-11-000042 |
 |
Providing and laying RCC kerb stones and painting to kerb stones in Timber yard main roads |
| 63 |
157-11-000044 |
 |
Providing RCC covering slab in Kasturabha nagar in ward 157 |
| 64 |
157-11-000045 |
 |
Construction of L shape drain and restoration of roads in Bore Gowda slum in ward No 157 |
| 65 |
157-11-000046 |
 |
Improvements to drains and Providing covering slabs to drains in Sanjaya nagar slum in ward No 157 |
| 66 |
157-11-000047 |
 |
Improvements to drains and coverin slabs to drains in MCT slum ward No 157 |
| 67 |
157-11-000048 |
 |
Improvements to roads and drains in Bytarayanapura AK Colony and providing CC to lanes in Bytaranapura slum behind plag Maramma temple in ward no 157 |
| 68 |
157-11-000049 |
 |
Construction of Individual houses for SC/ST People in juridiction of ward No 157 |
| 69 |
157-11-000050 |
 |
REPAIRS AND MAINTAINENCE BOREWELL AND PANEL BOARD |
| 70 |
157-11-000051 |
 |
PROVIDING AND CONSTRUCTION OF STONE PARGOLA BENCHES WITH PLOTFORM, FENCE REPAIR, PAINTING IN TELECOM LAYOUT PARK |
| 71 |
157-11-000052 |
 |
PROVIDING AND CONSTRUCTION OF RAIN WATER HARVESTING UNIT AND REPAIR TO FOUNTAIN GRILL, BENCHES WITH PLOTFORM |
| 72 |
157-11-000053 |
 |
TREE PLANTING IN WARD 157, 158 AND 134 |
| 73 |
157-11-000054 |
 |
MAKING OF LEAF LITTER COMPOST IN PARKS IN WARD-157 |
| 74 |
157-11-N-G-O-P-PL-001 |
 |
RAISING AND MAINTENANCE OF PLANTATION IN IN WARD NO. 157 |
| 75 |
157-12-000004 |
 |
Providing Rain water harvesting in Buildings, Parks, Burial Ground, Footpath and Roads in ward no. 157 |
| 76 |
157-12-000005 |
 |
Construction of Brick platform (Brick on edges) for trees in ward no 157 |
| 77 |
157-12-000006 |
 |
Construction of Dry Waste Collection Centre at Ambedkar Samudaya Bhavan 6th cross Avalahalli Deepanjali nagar Bangalore |
| 78 |
157-12-000007 |
 |
Construction of percolation tank Along the road side drains in ward No. 157 Gali Anjaneya temple ward |
| 79 |
R-157-11-000001 |
 |
CONST OF NIRMALA TOILET IN FRONT OF BAPUJINAGAR BUS STAND IN WARD NO 41 |
| 80 |
157-14-000001 |
 |
Providing RCC Drain and culverts from 1st Cross of Raghava Nagara upto SWD towards Kalidasa Layout in Ward No157 |
| 81 |
157-14-000002 |
 |
Providing RCC Drain in 2nd Cross of Raghava Nagara in Ward No157 |
| 82 |
157-14-000003 |
 |
Providing RCC Drain and culvert at D Cross in Bytarayanapura Hosabadavane in Ward No.157 |
| 83 |
157-14-000004 |
 |
Providing RCC Drains to 4th Cross Somanatha School of Chairman Narasimhaiah Layout in Ward No157 |
| 84 |
157-14-000005 |
 |
Providing CC Roads in Kasturba Nagar and Bytarayanapura New Extention in Ward No157 |
| 85 |
157-14-000006 |
 |
Improvements and Consturction of culverts at Avalahalli Main Road in Ward No157 |
| 86 |
157-14-000007 |
 |
Providing CC Road RCC Drain and culverts at Sanjay Nagara slum near Muthu Maramma Temple in Ward No157 |
| 87 |
157-14-000008 |
 |
Providing pot holes filling and Road Cut Potions in Ward Jurisidiction of Ward No157 |
| 88 |
157-14-000009 |
 |
Ward Maintenance in Sri Gali anjaneya Swamy temple Ward NO157 for the period 2013-14 |
| 89 |
157-14-000010 |
 |
Providing RCC Drain to SWD passing behind of Sharada school in Ward No157 |
| 90 |
157-14-000011 |
 |
Desilting of Road side drains in Muneshwara Block Gajendra Nagara Bytarayanapura Hosabadavane Kasturba Nagar Timber Yard L O in Ward No157 |
| 91 |
157-14-000012 |
 |
Improvements to loop road to NAK Choultry opp road in Ward No 157 |
| 92 |
157-14-000013 |
 |
Improvements to drain and culverts 2nd and 3rd Main road in Byatarayanpura Hosabadavane in Ward No 157 |
| 93 |
157-14-000014 |
 |
Providing CC Road to 3rd 4th 5th Cross of Ganapathi Nagara in Ward No157 |
| 94 |
157-14-000015 |
 |
Construction of SSM retaining wall for secondary SWD V 102 near Gali Anjaneya temple Mysore road |
| 95 |
157-14-000016 |
 |
Supply and fixing of DG set UPS and connected accessories to Kasturibanagar Maternity Home |
| 96 |
157-14-000017 |
 |
Smt. Sulochana |
| 97 |
157-14-000018 |
 |
Impts to roads, drains and covering slabs at 1st main Timber yard layout from way bridge to Bunda Anjaneya temple both sides in W-157. |
| 98 |
157-14-000019 |
 |
Impts to roads, drains and covering slabs at Bunda Anjaneya temple to Karnataka state forest office both sides in W-157. |
| 99 |
157-14-000020 |
 |
Impts to roads, drains and covering slabs at 1st main Timber yard layout from Bridge via S.R.S travels to Karnataka state forest office both sides in W-157. |
| 100 |
157-14-000021 |
 |
Impts to roads, drains and covering slabs from road Opp. To S.R.S travels upto junction of Telecom layout main road both sides in W-157. |
| 101 |
157-14-000022 |
 |
Impts to roads, drains and covering slabs at Byatarayanapura hosa badavane main roads and cross roads in W-157. |
| 102 |
157-14-000023 |
 |
Formation of new road in Byatarayanapura hosa badavane in Industrial area in W-157. |
| 103 |
157-14-000024 |
 |
Drilling of 5nos borewells in selected areas Deepanjalinagar in W-157. |
| 104 |
157-14-000025 |
 |
Construction of Anganawadi and Multipurpose building at Ward No.157 |
| 105 |
157-14-000026 |
 |
Maintainence of Sri Bala Gangadhara Swamy Park Telecom Layout park |
| 106 |
157-14-000027 |
 |
Maintainence of Kasthuriba Nagar I.P.P Hospital Park |
| 107 |
157-14-000028 |
 |
Construction of RCC Drain with B.S.Slab coverings, Kerb stone in Byatarayanapura Main Road (From Byatarayanapura Police Station to Narasimmaiah Badavane road cross) by utilizing availanale materials f |
| 108 |
157-14-000029 |
 |
Construction of RCC Drain with B.S.Slab coverings, Kerb stone in Byatarayanapura Main Road (From Govt School to Maramma Temple cross) by utilizing availanale materials from existing drain |
| 109 |
157-14-000030 |
 |
Construction of RCC Drain with B.S.Slab coverings, Kerb stone in Byatarayanapura Main Road (From 3rd cross to AK Colony cross) by utilizing availanale materials from existing drain |
| 110 |
157-14-000031 |
 |
Construction of RCC Drain with B.S.Slab coverings, Kerb stone in Byatarayanapura Main Road (From 1st cross to near Galaxy Bar) by utilizing availanale materials from existing drain |
| 111 |
157-14-000032 |
 |
Construction of RCC Drain with B.S.Slab coverings, Kerb stone in Byatarayanapura Main Road (From F cross to Saint lawrence School cross) by utilizing availanale materials from existing drain |
| 112 |
157-14-000033 |
 |
Drilling of borewell with pipeline of various places in narasimaiah colony in Gali anjaneya swamy ward 157 |
| 113 |
157-14-000034 |
 |
Drilling of borewell with pipeline of various places of in kasuturabanagara in gali anjaneya swamy ward 157 |
| 114 |
157-14-000035 |
 |
Drilling of borewell with pipeline of various places of in sanjaya nagara slum in gali anjaneya swamy ward 157 |
| 115 |
157-14-000036 |
 |
Drilling of borewell with pipeline of various places of in next to tunga bar at avalahalli in gali anjaneya swamy ward 157 |
| 116 |
157-14-000037 |
 |
Asphalting and improvements to Byatarayanapura police station to Muneswara block main road in W.N 157 |
| 117 |
157-14-000038 |
 |
Asphalting and improvements in Byatarayanapura badavane in W.N 157 |
| 118 |
157-14-000039 |
 |
Asphalting and improvements in selected roads in |